ABOUT RUIBIAN

Transformer engineering for critical power applications.

We design and manufacture transformers for the networks, buildings and industries that depend on them. See how our transformers are built, from winding and assembly to testing.

RUIBIAN TRANSFORMER

From distribution rooms to grid substations.

Ruibian (Jiangsu) Electric Power Co., Ltd. supplies dry-type and oil-immersed transformers, pad-mounted transformers and compact substations. Our work spans utility networks, renewable energy, data centers and industrial power.

Some customers arrive with a detailed equipment schedule. Others bring an existing nameplate or the outline of a new facility. Both are a starting point for turning an electrical requirement into a transformer design.

120,000 m²Production area
20,000 MVAAnnual capacity
80+Countries delivered
Cast-resin transformer during final assembly in the workshop
Final assembly of a cast-resin transformer.

INSIDE THE WORKSHOP

Before it becomes a finished transformer.

The winding, insulation and assembly stages are less visible than the finished tank or enclosure. They are also where much of the work takes place.

Take a closer look
Horizontal winding machine in the transformer manufacturing workshop
Horizontal winding equipment. Coil construction follows the electrical and mechanical design.

Different designs take different routes.

A cast-resin coil goes through moulding and vacuum casting. An oil-immersed transformer takes a different route through insulation drying, tank assembly and oil processing.

The factory gallery shows these operations and the equipment used at each stage, rather than just the finished product.

Vapour-phase drying equipment for transformer insulation
Vapour-phase drying equipment.

TESTING & QUALITY

Testing is part of the build.

Electrical tests measure how the transformer performs against its design and the agreed requirements. The test programme and reports belong with the equipment documentation.

Our quality and certificate pages let you look beyond a badge: see the test facilities, read the documents and check the models and ratings they cover.

Impulse generator in the transformer test facility
Impulse test equipment. Required tests are agreed for the specific transformer order.

MANUFACTURING MILESTONES

Building the capability, year by year.

2013

New facility

Built a new factory of more than 60,000 m² and added an oil-immersed transformer line.

2017

110 kV transformer capability

Obtained a 110 kV type test report.

2019

110 kV cast-resin dry-type development

Developed a 110 kV class three-phase epoxy resin cast dry-type power transformer.

Want to see what we make?

Browse the transformer range, or start with the industry you work in.

LET'S TALK

Talk to the team about your next transformer.

A new installation, an expansion or a replacement: tell us what you are working on and what you need to know.

Contact Ruibian