FACTORY / PRODUCTION / QUALITY
Transformer factory and manufacturing
A 120,000 m² production base with a 20,000 MVA annual capacity, running the full build-and-test cycle in-house under one roof.
120,000 m²Production area
20,000 MVAAnnual capacity
~2,000Units / month
80+Countries delivered
THE PROCESS
From core to tested unit, in-house.
INSIDE THE PLANT
The equipment behind the build.
TESTING
Testing plans and reports.
Discuss testing requirements for cast-resin dry-type transformers, liquid-immersed transformers and substations with the project team. Confirm routine, type and special tests, witness inspections and required reports for the specified model.
View certification evidenceSTANDARDS
Confirm the applicable standards.
Specify the destination market and required standards in your enquiry. Confirm which certificates and test reports apply to the proposed model, ratings and project scope.
Review quality controlsNEXT STEP
Need factory evidence for your audit?
Share the standards, inspection requirements and document package required by your project.