APPLICATION / Renewable
Wind Farms
Wind turbine nacelle and collector substation transformers.
PROJECT CONTEXT
Translate the application into a verified scope.
Application requirements are reviewed with the project team before the transformer configuration and documentation package are confirmed.
For a wind farm, provide the project capacity, generation and collector network voltages, and whether the equipment is for a turbine or a substation.
Final transformer ratings, applicable standards and documentation are confirmed after project qualification.
RELATED PRODUCTS
Choose the transformer platform.
NEXT STEP
Specify your transformer.
Share the application, voltage class, capacity, environment and delivery requirements for a preliminary datasheet and indicative pricing.