Overview
Explore the configuration.
Review the package as a coordinated assembly rather than a transformer alone. The transformer, switching equipment, protection, ventilation and site interfaces need an agreed scope for the intended indoor or outdoor installation.
Select 1, 2 or 3 to explore the configuration. Markers indicate discussion areas, not an assembly drawing.
Connections
Start with the network voltages and connection arrangement. Review the terminal or cable interfaces against your system and project drawing.
Plan the footprint, access and cable routes using the approved outline drawing. Share the installation environment so the mechanical interfaces can be reviewed.
Standards & compliance GB / IEC / IEEE / UL / CE / ASTA Applicable standards and required certificates or test reports must be agreed for the specific project. A standard listed here is not a certification claim.
Listed options describe the product range. Final ratings, compatible combinations and performance are confirmed in the approved project datasheet.
Manufacturing
A closer look at our factory.
Explore our manufacturing and test equipment. The production route and acceptance tests are agreed for each configuration.
01
Horizontal winding machine 1
02
Dry-type assembly station
03
Dry-type test center
Images from our factory gallery. Equipment shown does not imply every product uses the same manufacturing process.
Does a dry-type transformer make the complete compact substation suitable outdoors?
Not by itself. State the installation environment, enclosure requirements, ventilation and access constraints. Suitability depends on the complete assembly and the confirmed project specification.
What do you need to prepare a quotation?
Start with your email and a short description. Tell us what you want to power, replace or purchase. You can send known ratings or a drawing, but you do not need to know every specification.
How are lead time, warranty and delivery agreed?
These are defined in the project quotation after reviewing the technical scope, quantity, destination and document requirements.