PRODUCT FAMILY / 1 LISTED PLATFORMS

Unit substation transformers.

Review the listed unit-substation platform up to 44 kV and 10,000 kVA. The key decision is how the transformer connects to the adjacent equipment and fits the site layout.

Compare published ranges. Confirm the final configuration with our engineers.

Unit substation transformers.
Product image for reference. Final layout varies with the selected configuration.

RANGE AT A GLANCE

Find the closest platform.

Listed options describe the product range. Final ratings, compatible combinations and performance are confirmed in the approved project datasheet.

On smaller screens, swipe the table to compare all columns.

Find the closest platform.
Product platformVoltage classCapacity rangeFrequencyCoolingDetails
Up to 44 kV Unit Substation TransformerUp to 44 kVUp to 10,000 kVA50 / 60 HzONAN / ONAF / KNAN / KNAFView product — Up to 44 kV Unit Substation Transformer

Products

A closer look at each route.

Open a platform for the published specifications, configuration options and project review points.

Unit substation

BEFORE YOU ENQUIRE

A useful quotation starts with your project.

Share the details you have. A short description is enough to begin; drawings and specifications can follow.

Request a Quote
  1. Transformer duty

    Primary and secondary service, capacity, frequency, impedance and tap requirements.

  2. Equipment interfaces

    Incoming and outgoing connection arrangement, adjoining switchgear, terminal positions, footprint and maintenance access.

  3. Scope & drawings

    Single-line diagram, equipment layout, connection drawings and a clear boundary for transformer and switchgear supply.

Questions

Before you shortlist.

Explore the Factory
Does this page describe a complete substation package?

It describes the transformer platform. Confirm separately which switching, protection, metering and auxiliary equipment belong to the supply scope.

How does this differ from a pad-mounted transformer?

The equipment interfaces and installation arrangement drive the choice. Share the layout and connection specification so our team can review the appropriate platform.

Can I ask for a quotation without all the ratings?

Yes. Describe the equipment or project you need to supply. Add the site country and any known voltage, capacity or drawing; our team can help identify the missing information.

Talk to an engineer

Tell us what you need.

A short description is enough. We’ll help clarify the specifications.

Unit substation transformers.

Add company, location or drawings (optional)
PDF, DWG, DXF · up to 3 files, 20 MB each

Completing security check…

Protected by Cloudflare Turnstile

Our engineers will review your inquiry and follow up with next steps.